Project Overview
P C Kelly Plumbing, Heating & Air Conditioning was appointed to carry out the complete plumbing and heating installation for a newly constructed family home.
Working alongside the principal contractor, electricians and other trades, our engineers delivered a full mechanical installation from the initial first fix stage through to final commissioning. The project required careful coordination to ensure every stage of the build progressed on programme while maintaining the highest standards of workmanship.
The completed installation provides the homeowners with a modern, energy-efficient plumbing and heating system designed to deliver reliable performance, excellent water pressure and economical heating for many years to come.
Customer Requirements
The customer required a plumbing and heating contractor capable of delivering a complete installation throughout the construction of their new home.
Their requirements included:
- Complete first and second fix plumbing.
- Modern central heating installation.
- Energy-efficient boiler.
- Reliable hot and cold water distribution.
- High-quality bathroom plumbing.
- Kitchen plumbing installation.
- Future-proof pipework layout.
- Professional testing and commissioning.
The customer also wanted a contractor capable of working closely with the wider construction team to ensure the project remained on schedule.
Our Solution
Following a review of the construction drawings, P C Kelly produced a complete plumbing and heating installation programme tailored to the build schedule.
Our directly employed engineers completed every stage of the installation, from underground services and first fix pipework through to sanitaryware installation, heating commissioning and final customer handover.
Using modern installation methods and high-quality materials throughout, the completed system provides outstanding reliability, energy efficiency and ease of maintenance.
Scope Of Works
The installation included:
- First fix plumbing.
- Hot and cold water pipework.
- Central heating pipework.
- Radiator installation.
- Ideal boiler installation.
- Heating controls.
- Kitchen plumbing.
- Bathroom plumbing.
- Utility room plumbing.
- Outside tap installation.
- Waste pipework.
- Soil pipe connections.
- Second fix plumbing.
- Testing and commissioning.
All work was completed by P C Kelly's directly employed Gas Safe registered engineers.
Installation / Delivery Details
First Fix Installation
The first fix stage formed the foundation of the entire plumbing and heating system.
Works included:
- Hot water pipework.
- Cold water pipework.
- Central heating pipework.
- Waste pipework.
- Soil stacks.
- Boiler connections.
- Service penetrations.
- Pipework pressure testing.
Every pipe run was carefully planned to maximise efficiency while allowing easy future access for maintenance if ever required.
Heating Installation
The property was fitted with a modern, energy-efficient central heating system centred around an Ideal Heating boiler, selected for its outstanding performance, reliability and manufacturer support.
The installation included:
- Ideal boiler.
- Radiators throughout.
- Thermostatic radiator valves.
- Heating controls.
- Magnetic system filter.
- Condensate pipework.
- Gas pipework.
- Heating system balancing.
The completed system delivers fast, responsive heating while helping minimise running costs.
Plumbing Installation
A complete plumbing system was installed throughout the property.
Works included:
- Kitchen plumbing.
- Utility room plumbing.
- Family bathroom.
- Ensuite bathroom.
- Cloakroom plumbing.
- Outside tap.
- Appliance connections.
- Isolation valves throughout.
The plumbing installation provides excellent water pressure and reliable operation throughout the home.
Second Fix
During the second fix stage, our engineers installed and connected all visible plumbing fixtures and heating equipment.
This included:
- Radiators.
- Bathroom sanitaryware.
- Taps.
- Toilets.
- Basins.
- Baths.
- Showers.
- Kitchen sink.
- Appliance connections.
Every fixture was installed with careful attention to detail, ensuring a clean and professional finish.
Project Challenges
Working to the Build Programme
Construction projects rely on close coordination between multiple trades.
Our engineers worked alongside builders, electricians, plasterers and decorators to ensure every stage of the plumbing and heating installation was completed on time.
Future Accessibility
Although much of the plumbing becomes hidden behind walls and floors, careful planning ensured isolation valves and serviceable components remained easily accessible for future maintenance.
High Standard Finish
As this was a brand-new family home, the customer expected exceptional workmanship throughout.
Every aspect of the installation was completed to the highest professional standard, with particular attention paid to pipework routing, equipment positioning and final presentation.
Testing & Commissioning
Before handover, the complete plumbing and heating installation underwent extensive testing.
This included:
- Pressure testing.
- Gas tightness testing.
- Heating system flushing.
- Chemical inhibitor dosing.
- Radiator balancing.
- Boiler commissioning.
- Hot water testing.
- Heating controls setup.
- Final inspection.
The customer also received a full demonstration of the heating controls and boiler operation before moving into their new home.
Project Outcome
The completed installation provides the homeowners with a modern plumbing and heating system designed for comfort, efficiency and reliability.
The customer now benefits from:
- Brand-new plumbing throughout.
- Energy-efficient Ideal boiler.
- Reliable heating.
- Excellent hot water performance.
- Modern heating controls.
- High-quality workmanship.
- Manufacturer-backed warranties.
- A professionally commissioned installation.
The project demonstrates P C Kelly's ability to deliver complete plumbing and heating packages for new build homes, from first fix through to final handover.
Why Choose P C Kelly?
P C Kelly Plumbing, Heating & Air Conditioning has over 40 years of experience delivering plumbing and heating installations for new build homes, self-build projects and residential developments throughout South Yorkshire.
Our domestic services include:
- New Build Plumbing
- New Build Heating
- Ideal Boiler Installations
- First Fix Plumbing
- Second Fix Plumbing
- Bathroom Installations
- Underfloor Heating
- Air Conditioning
- Boiler Servicing
- Annual Maintenance
All work is completed by our directly employed engineers, ensuring consistent quality, excellent communication and complete accountability throughout every project.
Services Delivered
- Complete Plumbing Installation
- Central Heating Installation
- Ideal Boiler Installation
- Hot & Cold Water Services
- First Fix Plumbing
- Second Fix Plumbing
- Bathroom Plumbing
- Kitchen Plumbing
- Testing & Commissioning
Related Services
- New Build Plumbing
- New Build Heating
- Ideal Boiler Installations
- First Fix Plumbing
- Second Fix Plumbing
- Bathroom Installation
- Underfloor Heating
- Domestic Plumbing
Related Case Studies
720kW Commercial Biomass Heating System
New-Build Student Accommodation Development
Biomass Fuels Care Home Savings
Swinton Care Home Redevelopment
Commercial Air Conditioning Servicing & Planned Maintenance Programme
Commercial Heating System Replacement for Apartment Block
Whether you're building a bespoke self-build property, developing multiple new homes or extending an existing property, P C Kelly Plumbing, Heating & Air Conditioning can provide a complete plumbing and heating installation tailored to your project.
From the initial first fix through to final commissioning, our experienced team delivers reliable, high-quality installations that are built to last and designed with efficiency, performance and future maintenance in mind.
Contact our team today to discuss your new build project or arrange a no-obligation quotation.